• <thead id="cwqsv"></thead>
    <strike id="cwqsv"><table id="cwqsv"></table></strike><dl id="cwqsv"><noframes id="cwqsv"></noframes></dl>
      1. <dl id="cwqsv"></dl>
        Wafangdian Guangyang Bearing Group Co., Ltd.

        Home >> Industry News

        Contact Us

        Tel£º400-0058-999
        Add£ºNo. 2200, Section 3, South Street,Wafangdian City, Liaoning Province, China
        Tel£º0411-85647733
        Fax£º0411-85647666
        Website£ºwww.ynsfzy.com

        Industry News

        Siemens Low Wind Prototype Turbine Installed in Drantum

        Release Time£º16 Mar,2017

        Siemens' new direct-drive low wind turbine has reached the prototype testing stage. The onshore model SWT-3.15-142, with a rotor diameter of 142 meters has successfully passed prototype approval and has now been erected at the Drantum wind test site in Jutland, Denmark. The IEC Class IIIA wind turbine is the first Siemens model to be equipped with rotor blades based on hybrid-carbon technology. With tower configurations allowing hub heights of up to 165 meters and 69 meter rotor blades the SWT-3.15-142 will set new standards in energy yield. The low wind turbine SWT-3.15-142 is part of the onshore direct drive product platform and uses the same nacelle as other models like the SWT-3.6-130 including major components like the hub, generator, cooling- and electrical systems. Specific settings of the Siemens Integrated Control System (SICS) and the lightweight 142 meter rotor allow the new SWT-3.15-142 to reach an outstanding efficiency. Even at average wind speeds of only six meters per second, it harvests an energy yield of ten gigawatt hours per year. "In our extended onshore product portfolio, the SWT-3.15-142 plays an important role since it is our first IEC Class IIIA wind turbine for this platform," said Morten Pilgaard Rasmussen, Head of Technology at Siemens Wind Power. "With LM¡¯s hybrid-carbon blades and our successful direct drive technology this model incorporates proven and highly efficient technology in all components and we are confident that we can maintain short time to market and have this product ready for serial production by the end of 2017." Installation of the SWT-3.15-142 has been completed with the rotor lift last week. Commissioning work will be finished with the turbine being fully operational by the end of March. The focus of the testing program of the prototype is on blade and performance evaluation.
        |
        Quick links
        Follow Us

        Mobile Website

        Wechat Platform

        GroupMore

        Wafangdian Guangyang
        Bearing Group Co., Ltd.

        Equipment & Capability

        Copyright@2017Wafangdian Guangyang Bearing Group Co., Ltd.

      2. <thead id="cwqsv"></thead>
        <strike id="cwqsv"><table id="cwqsv"></table></strike><dl id="cwqsv"><noframes id="cwqsv"></noframes></dl>
          1. <dl id="cwqsv"></dl>
            影音先锋丝袜性爱电影 | 永久无码| 日韩三级电影在线播放 | 夜色88v精品国产 | 乱论网站 |